Facebook Twitter LinkedIn YouTube Menu Search Arrow Right Arrow Left Arrow Down Arrow Up Home Arrow Next Arrow Previous RSS Icon Calendar Icon Warning Icon
NOTICE: The EASA office will be closed Dec. 24, 2024 - January 1, 2025. Technical support will still be available. For quickest response, please use the online support forms or send your inquiry to technicalsupport@easa.com.
EMAIL GENERAL INQUIRY REDESIGN REQUEST

Filter the results

  • Enter one or more words to find resources containing any of the words entered
  • Enter words or phrases between " " to find exact match

Webinar Recordings

Trade press article — Plant Services

Loaded question: How much do you know about motor load?

Careful evaluation of motor load requirements could yield long-term savings

  • January 2016
  • Number of views: 7971
  • Article rating:

By Mike Howell
EASA Technical Support Specialist

Right-sizing of three-phase induction motors for different applications – and striking a balance between reliability and efficiency – isn’t always easy, but it can be cost-effective. Before the days of comprehensive predictive and preventive maintenance programs, the conventional approach to reliability was conservatism, both in design and in application. That’s to say that on a 25 hp application, you’d find a very conservatively designed 60 hp motor that was really 75 hp “under the hood.” And yes, the motor would last a very long time, but it would have an inflated (and often ignored) operational cost. Many of these robustly engineered applications are still out there, and it can be well worth the effort to identify and correct them.

Some of the topics covered include:

  • New vs existing applications
  • Determining the actual load
  • Determining typical loading by measuring the average input power
  • Line amps
  • Locked-rotor amps
  • Starting torque
  • Special applications

READ THE FULL ARTICLE



Print


Comments are only visible to subscribers.