Facebook Twitter LinkedIn YouTube Menu Search Arrow Right Arrow Left Arrow Down Arrow Up Home Arrow Next Arrow Previous RSS Icon Calendar Icon Warning Icon

ANSI/EASA AR100-2020 cover

ANSI/EASA Standard AR100-2020
ANSI/EASA AR100-2020: Recommended Practice for the Repair of Rotating Electrical Apparatus is a must-have guide to the repair of rotating electrical machines. It establishes recommended practices in each step of the rotating electrical apparatus rewinding and rebuilding processes.

LEARN MORE & DOWNLOAD

Questions?

For information about ANSI/EASA AR100 or questions about the work on this standard, contact:

Mike Howell, PE
EASA Technical Support Specialist
+1 314 993 2220
mhowell@easa.com

ANSI Accredited Standards Developer Information

Guidelines for vertical pump removal and installation

  • February 2015
  • Number of views: 9999
  • Article rating: 5.0

Gene Vogel
EASA Pump & Vibration Specialist

Service centers that provide field service for equipment removal and installation have little trouble handling most common horizontal pumps. However, vertical turbine pumps (and similarly mounted vertical pumps) present some additional challenges. Vertical pumps of this style use the discharge column to suspend the pump below grade from a grade mounted discharge casing. The casing provides the support for the pump, the pedestal for the vertical drive motor, and a 90 degree discharge elbow. The discharge elbow may be above or below grade.

The initial challenge for pump removal is presented by the length of the pump. Short set pumps range to about 50 ft. (15 meters) in overall length, minus the drive motor. Deep set pumps can extend hundreds of feet (or meters) into a well or sump. The designation as short set or deep set is somewhat arbitrary, depending on the working height of the available crane to lift the machine. A short set pump could be handled as a single piece (again, less the motor). But if the length of the pump exceeds the working height of the crane, then field disassembly is necessary – usually referred to as a deep set pump.

Topics covered include:

  • Documenting the condition of the machine
  • Overhead clearances
  • Reinstalling the pump
  • Tests

LOGIN TO DOWNLOAD THE ARTICLE



0Upvote 0Downvote
Rate this article:
5.0
Print


Comments are only visible to subscribers.

EASA Rewind Study cover

The Effect of Repair/Rewinding on Premium Efficiency/IE3 Motors
Tests prove Premium Efficiency/IE3 Motors can be rewound without degrading efficiency.

DOWNLOAD THE FULL RESULTS

BUY PRINTED COPIES

EASA Good Practice Guide

Good Practice Guide to Maintain Motor Efficiency
Based on the 2019 and 2003 Rewind Studies of premium efficiency, energy efficient, IE2 (formerly EF1) and IE3 motors

LEARN MORE & DOWNLOAD