Voltage Drop Test Tips and Procedures - Private Webinars...
Facebook Twitter LinkedIn YouTube Menu Search Arrow Right Arrow Left Arrow Down Arrow Up Home Arrow Next Arrow Previous RSS Icon Calendar Icon Warning Icon

How to schedule

To schedule private education for your group, contact:

Dale Shuter, CMP
Meetings & Expositions Manager

+1 314 993 2220, ext. 3335
dshuter@easa.com

1 hour of training

$500 for EASA Chapters/Regions
$800 for member companies
$1000 for non-members

How a webinar works

All EASA private webinars are live events in which the audio and video are streamed to your computer over the Internet. Prior to the program, you will receive a web link to join the meeting. 

The presentation portion of the webinar will last about 45 minutes, followed by about 15 minutes of questions and answers.

Requirements

  • Internet connection
  • Computer with audio input (microphone) and audio output (speakers) appropriate for your size group
  • TV or projector/screen

Zoom logo

The Zoom webinar service EASA uses will ask to install a small plugin. Your computer must be configured to allow this in order to have full functionality. Please check with your IT department or company's security policy prior to scheduling a private webinar.

Private Webinars

EASA's private webinars are an inexpensive way to bring an EASA engineer into your service center, place of business or group meeting without incurring travel expenses or lost production time.

The list below is a sampling of topics that could be made available to your group. Any webinar previously presented by EASA staff could potentially be made available for your meeting!
See other topics presented previously.

Article

Voltage Drop Test Tips and Procedures

  • October 2026
  • Number of views: 67
  • Article rating:

Chuck Yung
EASA Senior Technical Support Specialist

One of the basic dependable tests for DC fields and synchronous fields is the voltage drop test. This test can be performed using AC or DC voltage, but EASA’s Technical Support Team receives a lot of questions about how to interpret the results. 

Let’s start with the basics of the test. When identical coils are connected in series and we apply a voltage across the set of coils, there should be an equal voltage drop across each field. A common example is four shunt fields in a DC motor. (See Figure 1.) If we apply 120V across the set of four fields, we can expect 30 volts drop across each field. 

Because the AC test is more rigorous, it exaggerates the imbalance resulting from shorted turns. The test behaves like the shorted secondary of a transformer, dramatically affecting the difference in voltages. Offsetting this advantage, the AC test is sensitive to differences in the iron surrounding the coils. For example, a weldment such as a foot or lifting ear can skew the results of an AC drop test. See the circled areas of Figure 1.

Figure 1

Figure 1

A typical 4-pole field frame with four fields and four interpoles. The circled areas indicate features that can influence an AC voltage drop test.

For these reasons, the AC voltage drop is the preferred test. If the AC drop test results are good, no further testing is needed. If the AC drop test is questionable, follow with a DC voltage drop test. Because the AC drop test is more stringent, the acceptance tolerance is +/- 10% of the average. Because the DC drop test is not as probing, the acceptance tolerance is +/- 5% of the average.

Available Downloads



Tags: Testing
0Upvote 0Downvote
Print