Facebook Twitter LinkedIn YouTube Menu Search Arrow Right Arrow Left Arrow Down Arrow Up Home Arrow Next Arrow Previous RSS Icon Calendar Icon Warning Icon

ANSI/EASA AR100-2020 cover

ANSI/EASA Standard AR100-2020
ANSI/EASA AR100-2020: Recommended Practice for the Repair of Rotating Electrical Apparatus is a must-have guide to the repair of rotating electrical machines. It establishes recommended practices in each step of the rotating electrical apparatus rewinding and rebuilding processes.

LEARN MORE & DOWNLOAD

Questions?

For information about ANSI/EASA AR100 or questions about the work on this standard, contact:

Mike Howell, PE
EASA Technical Support Specialist
+1 314 993 2220
mhowell@easa.com

ANSI Accredited Standards Developer Information

¿Qué hay de nuevo en la norma para pruebas de resistencia de aislamiento IEEE 43?

  • April 2016
  • Number of views: 34760
  • Article rating: No rating

La norma para realizar las pruebas de resistencia de aislamiento en los devanados de motores y generadores del Instituto de Ingenieros Eléctricos y Electrónicos (IEEE), publicada en el 2002 ha sido revisada. La edición del 2013 fue publicada en Marzo del 2014. Este artículo examina los cambios al estándar.

What’s new in the IEEE 43 insulation resistance testing standard?

  • April 2016
  • Number of views: 22473
  • Article rating: 4.7

The Institute of Electrical and Electronics Engineers (IEEE) standard for insulation resistance testing of motor and generator windings that was published in 2002 has been revised. The 2013 edition was published in March 2014. This article examines the changes to the standard.

Getting the most from power factor tip-up testing

  • April 2017
  • Number of views: 17377
  • Article rating: 1.0

The power factor tip-up test is commonly used as a quality measurement for new coils and windings manufactured for AC motors and generators rated 6 kV and higher. It can also be useful in the rewind shop to verify the quality of a newly-installed coil system including the effectiveness of VPI processing.

Aprovechando al máximo la prueba de factor de potencia tip-up

  • April 2017
  • Number of views: 16229
  • Article rating: 5.0

 

La prueba de volcado del factor de potencia se usa comúnmente como una medida de calidad para bobinas y devanados nuevos fabricados para motores de CA y generadores con clasificación de 6 kV y más. También puede ser útil en el taller de rebobinado para verificar la calidad de un sistema de bobina recién instalado, incluida la efectividad del procesamiento de VPI.

Best AC Rewind Practices

  • February 2021
  • Number of views: 15804
  • Article rating: 4.0
FREE for Members of EASA

This webinar recording shares some of the “best practice” rewind methods used by (and learned from) EASA service centers around the world: connection recognition, best insulating materials, wire choices and tips to save time and effort.

How To Wind Three-Phase Stators (Version 2)

Self-paced, interactive training for stators 600 volts or less

  • February 2017
  • Number of views: 15771
  • Article rating: 4.5

This EASA software is a valuable interactive training tool ideal for training your novice(s) ... and even experienced winders will learn from it. The CD teaches how to wind in a richly detailed, step-by-step approach which includes narrative, animations and video clips, with tests to assess student comprehension. 

The importance of stator core loss testing before and after burn-off process

  • June 2014
  • Number of views: 15555
  • Article rating: 4.1

By this time we should all know that stator core loss testing is a required part of a quality rewind. A core loss test before and after burn-off is specified in the EASA Recommended Practice for the Repair of Rotating Electrical Apparatus (ANSI/EASA AR100) and The Effect of Repair/Rewinding on Motor Efficiency; EASA/AEMT Rewind Study and Good Practice Guide to Maintain Motor Efficiency.

Topics covered in this article include:

  • Lessons learned
  • Rebates add incentive
  • Learning from other members
  • Determining if the core is usable
  • Accurate iron measurements

Keeping it cool: A look at causes of motor overheating

  • March 2015
  • Number of views: 15018
  • Article rating: 5.0

We know that excessive temperature and moisture are the largest contributors to bearing and winding failures. Understanding the source of the increased temperature will help us to correct the problem and improve the machine’s life expectancy.

Inverter Duty Motor Rewinding

  • April 2021
  • Number of views: 13723
  • Article rating: 1.7
FREE for Members of EASA

This webinar recording reviews the failures associated with 3-phase motors on Variable Frequency Drives (VFDs) and how to rewind to limit future failures.

Mitigating Risk with Insulation Systems

  • September 2021
  • Number of views: 12328
  • Article rating: No rating

Relevant standards including IEC 60085 and IEEE 1 have similar definitions for electrical insulating materials (EIM) and electrical insulation systems (EIS). As with any system, there is an interaction between the materials used, and the insulation system developers take great care to ensure that this interaction does not lead to undesirable outcomes.

EASA Rewind Study cover

The Effect of Repair/Rewinding on Premium Efficiency/IE3 Motors
Tests prove Premium Efficiency/IE3 Motors can be rewound without degrading efficiency.

DOWNLOAD THE FULL RESULTS

BUY PRINTED COPIES

EASA Good Practice Guide

Good Practice Guide to Maintain Motor Efficiency
Based on the 2019 and 2003 Rewind Studies of premium efficiency, energy efficient, IE2 (formerly EF1) and IE3 motors

LEARN MORE & DOWNLOAD